Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2011 | PLUMBING - FINAL | Approved | STERILIZATION REPORT PROVIDED. REFEE WAS PAIS ON 5/11 | |
| 06/16/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL COUNTER SINK TAPPED CLEANOUT PIPING |
|
| 06/14/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A P TRAP WITH CORRECT DRAIN CONNECTION FOR FREE STANDING DRINKING FOUNTAIN BY STAIRWELL 2) PROVIDE STRAINERS AT 2 SHOWER DRAINS 3) SEE NOTE #24 AND PROVIDE STERILIAZTION AND BACTERIA REPORT FOR THIS ADDESS 4) PROVIDE VACUUN BREAKERS ON ALL |