Permit: T11CM00159

Parcel: 13321155A


Addresses:

201 N JESSICA AV


Inspection Status: Approved

Inspection History: MECHANICAL - HYDRONIC PIPING

Permit Number - T11CM00159

Inspection Description - MECHANICAL - HYDRONIC PIPING

Inspection Status - Approved

Date Description Inspector Results Comments
01/31/2012 MECHANICAL - HYDRONIC PIPING Approved IVRS - Inspection :*
01/30/2012 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) NO BODY ON SITE
01/23/2012 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 3RD AND 4TH FLOOR PATCHING COMPLETED
01/11/2012 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) FIRE CAULKING FLOORS 1 & 2 OK
2) DRYWALL PATCHING IS PROGRESSING
01/03/2012 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 1ST FLOOR INSULATING COMPLETE
2) STILL NEED FIRE CAULK AND PATCHING
12/28/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 1ST FLOOR SOUTH AND WEST CORRIDOR UNITS INSULATION OK, REPAIR ALL OPENINGS IN DRAFT STOP ABOVE CEILING FIRE CAULK NOT COMPLETE
12/16/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) ALL OPENINGS IN DRAFT STOP WITHIN RETURN AIR PLENIUMNS MUST BE REPAIRED-NO EXCEPTIONS
2) 2ND FLOOR INSULATING AND FIRE CAULK COMPLETE
12/15/2011 MECHANICAL - HYDRONIC PIPING Not ready for Inspection IVRS - Inspection :*
12/13/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 3RD FLOOR COMPLETE
12/06/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) STILL NEED FIRE CAULKING 4TH FLOOR
12/02/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 4TH FLOOR INSULATION PROGRESSING
11/30/2011 MECHANICAL - HYDRONIC PIPING Not ready for Inspection IVRS - Inspection :*
11/14/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) OK TO INSULATE BREEZEWAY PIPING
11/10/2011 MECHANICAL - HYDRONIC PIPING Not ready for Inspection IVRS - Inspection :*
11/09/2011 MECHANICAL - HYDRONIC PIPING Not ready for Inspection IVRS - Inspection :*
11/04/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
11/03/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) HYDRO PIPING FROM MECHANICAL ROOM TO ASSISTED LIVING OK TO INSULATE
10/27/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) INSULATION MAINS IN ASSISTED LIVING DINING ROOM OK
2) 4TH FLOOR FAN COIL PIPING PROGRESSING
3) NEED TO SEE INSULATION
10/26/2011 MECHANICAL - HYDRONIC PIPING Not ready for Inspection IVRS - Inspection :*
10/25/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 100 PSI TEST ON MAIN PIPING IN ASSISTED LIVING BLDG
2) UP TO EXERCISE EOOK OK TON INULATE
05/20/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) BLDG "C" AND "D", MAINS THROUGH CORRIDORS TO STUB OUT IN ROOMS PRESSURE TEST OK AT 100 PSI. OK TO INSULATE IN CORRIDORS
05/13/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) ALL MAIN PIPING IN MAIN BLDG OK FOR INSULATION UP TO EXISTING PIPING
05/11/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 1ST FLOOR CORRIDORS OK FOR INSULATION
2) 100 PSI HYDRO TEST OK
05/04/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
1) 2ND FLOOR OK TO INSULATE
2) ALL RISERS OK TO INSULATE TO THE 1ST FLOOR EXCEPT SOUTH EAST-OK 4TH THRU 2ND
3) 100 PSI TEST OK
05/02/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
OK TO INSULATE ALL 3RD FLOOR PIPING.
2ND FLOOR NE CORRIDOR OK FOR INSULATION
100PSI TEST OK
04/29/2011 MECHANICAL - HYDRONIC PIPING Not ready for Inspection IVRS - Inspection :*
04/26/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*
04/18/2011 MECHANICAL - HYDRONIC PIPING Partial Approval IVRS - Inspection :*