Inspection Status: Approved
Inspection History: GRADING - TIER REV
| Date |
Description |
Inspector |
Results |
Comments |
| 05/01/2013 |
GRADING - TIER REV |
|
Approved |
|
| 03/20/2012 |
GRADING - TIER REV |
|
Continued |
WORKING ON BASIN CHANGE PER GRADING TIER REV 3-19-2012. |
| 03/19/2012 |
GRADING - TIER REV |
|
Approved |
Tier 1 Revision: modification to PC/COT Stnd Dtl 310. Per EOR: "SW 42" pipe will connect into the side for the box, the SE 42" pipe will connect into the 4' wing wall (depth extended to accommodate pipe), and the N 48" pipe connecting into the backside of the catch basin. The back side of the catch basin is approximately 7.65' wide should accommodate the pipe connecting at a 45 degree angle." See detail. |