Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T11BU01211
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/01/2013 | GRADING - INTERMEDIATE | Approved | ||
12/11/2012 | GRADING - INTERMEDIATE | Continued | STILL WORKING ON D.G IN LANDSCAPING AREA. | |
10/25/2012 | GRADING - INTERMEDIATE | Approved | ||
10/10/2012 | GRADING - INTERMEDIATE | Continued | WORKING IN PARKING AREA ON NORTH SIDE OF BUILDING. | |
09/20/2012 | GRADING - INTERMEDIATE | Continued | STARTED LANDSCAPE INSPECTION PER HIGH LIGHTED ON SMALL SET OF APPRVED PLANS. | |
09/18/2012 | GRADING - INTERMEDIATE | Continued | STRIPING AND LANDSCAPING WORK ON NORTH SIDE OF BUILDING. | |
09/17/2012 | GRADING - INTERMEDIATE | Continued | NORTH PARKING AREA INSALLING TREES. STRIPING NORTHWEST SIDE OF PARKING AREA. | |
09/13/2012 | GRADING - INTERMEDIATE | Continued | NO CHANGE TO OUT SIDE BUILIDING FROM LAST INSPECTION. | |
09/11/2012 | GRADING - INTERMEDIATE | Continued | NO CHANGE TO OUT SIDE BUILDING FROM LAST INSPECTION. | |
09/06/2012 | GRADING - INTERMEDIATE | Continued | NO CHANGE FROM LAST INSPECTION. | |
08/31/2012 | GRADING - INTERMEDIATE | Continued | GOT WITH CONTACTOR STRIPING STARTS IN OCTOBER. | |
08/29/2012 | GRADING - INTERMEDIATE | Continued | NO GRADING ACTIVITY AT THIS TIME. | |
08/23/2012 | GRADING - INTERMEDIATE | Continued | NO OUT SIDE ACTIVITY. | |
07/27/2012 | GRADING - INTERMEDIATE | Continued | RON AND I WALKED THROUGH THE SITE AND LOOKED AT THE PAVEMENT SUBGRADES THAT HAVE BEEN PREPARE ON THE NORTH, WEST, AND SIDES OF THIS PROJECT. THE CONTRACTOR IS PLANNING ON PAVING THESE AREAS NEXT WEE, WEATHER PERMITTING. | |
07/26/2012 | GRADING - INTERMEDIATE | Continued | CREWS WORKING ON PROCESSING THE GRADES ON THE NORTH SIDE FOR THE PLACEMENT OF ASPHALT PAVEMENT NEXT WEEK. HAVE ASKED THEM TO CALL IN THE INSPECTION FOR THE RAINWATER INTERMEDIATE SO THAT WE CAN CHECK THE GERADES TO MAKE SURE THAT THEY ARE MEETING THEIR REQUIREMENTS FOR THE SITE. CREWS ALSO WORKING ON POURING CONCRETE FOOTERS FOR BOLLARDS ALONG THE NORTHSIDE ENTRANCES. | |
05/30/2012 | GRADING - INTERMEDIATE | Continued | STILL WORKING ON GRADING AND CURBING IN PARKING AREA. | |
05/16/2012 | GRADING - INTERMEDIATE | Continued | GRADING FOR PAVING PARKING AREA. | |
05/08/2012 | GRADING - INTERMEDIATE | Continued | STORM DRAIN PIPING INSTALL PER HIGH LIGHT ON PAGE C4.3. | |
05/07/2012 | GRADING - INTERMEDIATE | Continued | WORKING ON STROM DRAIN AT GATE. | |
04/26/2012 | GRADING - INTERMEDIATE | Continued | WORKING ON GRADING AND CURBING ON NORTH PARKING AREA. | |
04/18/2012 | GRADING - INTERMEDIATE | Continued | LOOKED OVER THE SITE AND CHECKED THE INSTALLATION OF SEWER PIPE AND MANHOLES BEING CONSTRUCTED AROUND THE NORTHWEST AND SOUTHWEST CORNERS OF THE BUILDING. ALL INSPECTED AREAS ARE HIGHLIGHTED ON THE PLANS IN THE CONTRACTORS OFFICE. | |
04/12/2012 | GRADING - INTERMEDIATE | Continued | BACK FILLING AROUND CATCH BASIN. | |
04/11/2012 | GRADING - INTERMEDIATE | Continued | WORKING ON BASIN ON WEST SIDE OF BUILDING. NO PIPING BEING INSTALL TODAY. | |
04/10/2012 | GRADING - INTERMEDIATE | Continued | FROMING AND INSTALLING CRUBING ON NORTH EAST PARKING LOT. | |
04/09/2012 | GRADING - INTERMEDIATE | Cancelled | IVRS - AP canceled | |
04/06/2012 | GRADING - INTERMEDIATE | Cancelled | IVRS - AP canceled | |
04/05/2012 | GRADING - INTERMEDIATE | Continued | NO PIPING INSTALL CHANGE. | |
03/08/2012 | GRADING - INTERMEDIATE | Continued | PER HIGH LIGHT ON C4.1. | |
02/22/2012 | GRADING - INTERMEDIATE | Continued | NO CONCERNS AT THIS TIME. | |
02/14/2012 | GRADING - INTERMEDIATE | Continued | NO CONCERNS AT THIS TIME. |