Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
10/25/2012 STORMWATER INSTALL OF CONTROLS Approved
04/04/2012 STORMWATER INSTALL OF CONTROLS Continued PER HIGH ON PAGES C4.3&C4.5. STILL NEED TO SEE 48'' STORM PIPE IN TO BASIN.
04/03/2012 STORMWATER INSTALL OF CONTROLS Continued PER HIGH LIGHTS ON C4.5 AND C4.4 REPAIR ON 48'' AT CATCH BASIN HAS NOT BEEN MADE.
03/30/2012 STORMWATER INSTALL OF CONTROLS Continued PER HIGH LIGHT ON PAGE C4.4& C4.6
03/29/2012 STORMWATER INSTALL OF CONTROLS Continued NO PIPE BEING INSTALLED AT THIS TIME.
03/28/2012 STORMWATER INSTALL OF CONTROLS Continued PER HIGH LIGHTS ON PAGES 4.4&4.5 AND 4.6
03/14/2012 STORMWATER INSTALL OF CONTROLS Continued INSTALL CATCH BASIN PER AP PLANS.
03/12/2012 STORMWATER INSTALL OF CONTROLS Continued WORKING ON WATER TIE-IN. NO STROM WATER PIPING INSTALLED AT THIS TIME.
03/01/2012 STORMWATER INSTALL OF CONTROLS Continued INSPECTION PER HIGH LIGHT ON PAGES C4.1 AND C4.2.
02/29/2012 STORMWATER INSTALL OF CONTROLS Continued STARTING TO INSTALL STROM DRAINS.