Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 07/20/2012 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
|
| 07/05/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NO CONCERNS AT THIS TIME. STABALIZE ALL DISTURBED AREAS PRIOR TO FINAL RELEASE. |
| 05/21/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH MIKE TO REPAIR CONTROLS. |
| 05/14/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH MIKE TO INSTALL NOI ON SWPPP INFO SIGN AT GATE. |
| 05/10/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH MIKE ABOUT SWPPP INFO AT GATE. |
| 05/09/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NOCONCERNS AT THIS TIME. |
| 05/07/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
ADD SWPPP CONTROLS FOR STOCK PILE. |
| 04/26/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NO TRACK OUT AT THIS TIME. |
| 04/13/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
SWPPP CONTROLS REPAIRS HAVE BEEN MADE. |
| 04/11/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH CONTRACTOR TO MAKE REPAIRS ON SWPPP CONTROLS ON STOCK PILE AND CATCH BASIN ON NORTHWEST SIDE OF SITE. |
| 04/06/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH MIKE TO MAKE REPAIRS TO SWPPP CONTRLS ON NORTH WEST STOCK PILE AND BASIN. |
| 03/30/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
SWPPP INFO HAS BEEN INSTALLED. |
| 03/26/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GATE LOCKED NO ONE ON SITE . STILL NO SWPPP INFO. |
| 03/20/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
RAIN DAY NO TRACK OUT STILL NO SWPPP INFO AT GATE. |
| 03/16/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
STILL NO SWPPP INFO AT GATE. |
| 03/08/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
SWPPP CONTROLS ARE IN PLACE. |
| 03/07/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH COTRACTOR TO INSTALL SWPPP CONTROLS AND CALL FOR PRE-CON MEETING. |