Inspection Status: Approved
Inspection History: SITE - SEWER
Permit Number - T10PL00160
Inspection Description - SITE - SEWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/16/2010 | SITE - SEWER | Approved | IVRS - Inspection :* | |
12/13/2010 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* 1) HAVE SHEET 8 OF 10 ON SITE WITH HIGHLIGHTED DRAWINGS FROM CONST. 2) YOUR PCDEQ AUTHORIZATION TO DISCHARGE FORM DOES NOT MEET THE TOTAL COTS THAT HAVE BEEN INSPECTED 3) MANHOLE #2 REQUIRES PRIVATE MANHOLE COVER 4) LIST MAY NOT BE COMPLETE |
|
12/09/2010 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
08/05/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
05/12/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
05/11/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) TESTING 8" WITH HCS LATERALS SHEET #5 OF 10 WITH BRET (WESTLAND) OK. TESTING 8" WITH HCS LATERALS AND 6" WITH HCS LATERALS SHEET 7 OF 10 OK. TESTING WITH HCS LATERALS AND 6" WITH HCS LATERALS SHEET 6 0F 10 OK TESTING OF ALL 6 PACKS SHOWN ON SHEETS 9 OF 10 AND 10 OF 10 FOR PHASES 2 & 3 ONLY |
|
05/07/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) HIGHLIGHT ON PAGLES 8 OF 10 |
|
04/29/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* ALL HCS SERVICES ON SHEET 5 OF 10 INSTALLED |
|
04/28/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) HCS LATERALS FOR COTS 1252 THRU 1264, LOTS 1207 THRU 1221, LOTS 1236 THRU 1251 2) STACKED MAN HOLES #4 & 5 |
|
04/21/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 8" SDR 35 FROM PRIVATE MANHOLE #5 TO PUBLIC MANHOLE #10 (MAIN ONLY) BASES POURED FOR #4 AND #5 |
|
04/19/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) FROM PUBLIC MANHOLE #30 TO PRIVATE MANHOLE #4 TO PRIVATE MANHOLE #5 FROM PRIVATE MANHOLE #2 THRU CLEANOUT #8 AND CLEANOUT #9 INCLUDING HCS LATERALS PER HIGHLIGHTED PAGES ? + 7 OF 10 STACKED MANHOLES #3 & #8 |
|
04/15/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) MANHOLE BASES #3 & 8 POURED 2) STACKED MANHOLE #1 & 2 |
|
04/12/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) BACK FILLING ONLY |
|
04/09/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) WATER STOP POUR BACK ON MANHOLES #31,43,42,18 AND 17 2) BASE ? FOR MANHOLE #1 & 2 3) PER HIGHLIGHT ON 6 OF 10 MAIN ONLY |
|
04/08/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) PER HIGHLIGHT ON SWR 6 THU 10 MAIN 8" AND 6" (ONLY) |
|
04/06/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
04/06/2010 | SITE - SEWER | Partial Approval | 8" FROM PRRIVATE MAN HOLE #1 TO APP 80' FROM #2, BO----- | |
04/05/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 6" SRD TRACER WIRE BEDDING OK TO BE TESTED AT LATER DATE PER HIGHLIGHT ON SWR 9 OF 10 PAGE 2) SRD 35 8" FROM MANHOLE #1 TO ? MANHOLE #31 PROVIDE TRACER WIRE 8" (ONLY) |
|
03/30/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) LOTS 147-152, 129 TO 146 BEDDING LAYING TRACER OK PER HIGHLIGHT PAGE 10 TO PAGE 9 |
|
03/25/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) PER INITIAL AND HIGHLIGHT ON PAGE 9 OF 10 |
|
03/22/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) INSPECTION OF SDR35. TRANSFER WI4RE AND BEDEL FOR HIGHLIGTER ON SWR PAGE ON APPEAL PLANNING. PIPING TO BE TEST AT A LATER DATE |
|
03/19/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) SDR 35 8" + 6" BEDDING AND TRACER WIRE INSTALL TO BE TESTED AT LATER DATE INSPECTION PER HIGHLIGHT ON PAGE H.10 |