Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/07/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/23/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* CONNECTIONS FROM CLAY TO DIP OK | |
| 06/22/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) D.I.P. INSTALLED UNDER BLDG TEST OK 2) NEED TO SEE CONNECTIONS BOTH SIDES 3) ENGINEER TO PROVIDE VERIFICATION OF GRADE |
|
| 06/16/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 05/12/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) D.I.P. NOT APPROVED UNDER THE BLDG 2) FARNCO NOT APPROVED FOR D.I.P. 3) D.I.P. INSTALLED UNDER BLDG WITHOUT INSPECTION |
|
| 05/11/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* |