Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) CONNECT ALL FIXTURES/APPLIANCES 2) BACKFLOW CERT-OK TO COVER YARDWATER 3) STERILIZATION AND CLEAN BACTERIA REPORT |
|
| 01/12/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 2" FROM 3" BLDG DRAIN TO ABOVE CLEANOUT HEIGHT AT HAND SINK WATER TEST PER INITIAL MP-03 2" FROM 3" BLDG DRAIN TO ABOVE CLEANOUT HEIGHT FOR HAND SINK PER INITIAL MP-03 WATER TEST 2) ALL DEMO CAPS TO BE PERMANENT CAPS |