Inspection History Details
Inspection Status: Denied
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2010 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A TRAP ON CONDENSATE DRAIN SUPPORT EVERY 4'. USE PURPLE PRIMER ON ALL PVC FITTINGS PRIOR TO GLUE 2) PROVIDE A BUSHING IN ELECTRIC DISCONNECT. DO NOT USE WHITE WIRE TO POWER THE A/C UNIT. FINISH CLAMPING ELECTRIC CONDUIT 3) PROVIDE THE REQUIRED GFI SERVICE RECEPT ON ROOF 4) ALL DUCT IN ATTIC MUST BE INSULATED WITH MINIMUM R8 INSULATION AND FLEX DUCTS SUPPORTED EVERY 5' 5) ROOF DRAWING INCOMPLETE. CLARIFICATION REQUIRED FOR STRUCTURAL SUPPORT OF A/C UNIT. ROOF IS PITCHED AND BEARING WALL DOES NOT APPLY 6) ID CIRCUIT BREAKER |