Permit: T10CM02391

Parcel: 116193760

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
02/02/2012 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
06/20/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) ASD-006 CHANGE ORDER ADA ACCOMADATIONS
2) OFFICE UNDER SLAB OK
06/15/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) OFFICE BLDG DRAIN CONNECTED TO BLDG SEWER OK
06/14/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) K-O AND 5-8 OK TO COVER
06/13/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
06/10/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
06/08/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) COLUMNS 2-5 AND A-G OK TO COVER
2) B0-THIS IS MY FORTH REQUEST FOR A COMPERHENSIVE PLUMBING PLAN, THAT INCLUDES ALL OF THE PLUMBING TO BE INSTALLED TO DATE
06/07/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) VISTOR CENTER UNDER SLAB OK
2) WATER TEST TO 10' OK
3) 4" PVC ROOF DRAIN STUBBED OUT ONLY
4) 2" TYPE WATER SERVICE STUBBED OUT 5'
05/26/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) NEW COMPLETE SET OF PLANS NOW AVAILABLE: DOES NOT INCLUDE RFI'S AND RED LINES FROM OLD SET. DOES NOT CONSOLISATE ARCHITECUAL AND PLUMBING PAGES TO GIVE COMPREHENSIVE PLUMBING PAGE
2) REVISION AT COLUMN H AND 8 OK TO COVER
05/25/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) TRUCK DOCK AREA DRAIN AS INITIALED ON P200B PLUMBERS PRINT
05/20/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) AS REDLINED ON P200B PLUMBERS PLAN OK TO COVER
05/16/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) FLAMMABLE WASTE FROM INTERCEPTOR TO COLUMN "S" AND FROM COLUMNS #2-#5 OK TO COVER
2) ? AT COLUMN=2'
3) WATER STUBBED OUT ? ?
05/11/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) FLAMMABLE WASTE AT G-2 AS INITIALED ON P200B N/H WITH HUSKEE BANDS-WATER TEST ONE RISER TO TEN FEET
2) INSPECTOR IS STILL WAITING FOR A COMPREHENSIVE PLUMBING PLAN SO HE DOESN'T HAVE TO REFER TO THREE DIFFERENT PAGES TO FIND OUT THE EXTENT OF PLUMBING
05/06/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) SANITARY WASTE AT S-5 AREA OK TO COVER AS RED LINED ON PLUMBERS PAGE P200B
05/04/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) COORDINATE PLUMBING ON ARCHETECTUAIL PAGES WITH THE PLUMBING ON THE PLUMBING PAGES - PROVIDE ONE APPROVED PLAN THAT SHOWS ALL OF THE PLUMBING
2) COLUMNS O-T & 2-5 AS INITIALED ON PZOOB PLUMBERS . OK TO COVER TRUNKLINE, PLUMBING STUBBED UP FOR NOW.PLAN
04/22/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
03/31/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection NOT ON LIST FOR ACCESS.