Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2012 | ELECTRIC - UNDERGROUND | Approved | IVRS - Inspection :* | |
| 01/25/2012 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 06/27/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK TEMP TO SUN MECH TRAILER 2) OK 1ST LIFT ROOMS ANNEX AREA 3) OK STUBS AT V3F 4) OK GROUNDING GEN PAD |
|
| 06/20/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK FLOOR BOXES AND CONDUITS EAST SIDE OFFICE & FOR RAISED FLOOR OUTLET 2) OK 3/4 PVC CONDUIT FOR EAST GARAGE RAMP |
|
| 06/15/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) GL A-O STUB OUTS |
|
| 06/14/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK CONTINUATION OF PVC COLUMN K TO E 2) OK 13 FLOOR BOXES 2ND FLOOR 3) OK DECK GARAGE SOUTH LOWER LEVEL LIGHTS |
|
| 06/13/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK 4-15 LIFT FOR LIGHTING EAST SIDE GARAGE 2) OK OULETS 1ST LIFT BOTTOM 1/2 UPPER LEVEL GARAGE 3) OK PVC CONDUITS CONTINUING COLUMN M-K |
|
| 06/10/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK 4-3" PVC BUILDING EDGE TO COMM ROOM (WEST) 2) OK 2-3" PVC, 6-1" PVC AND ? BLDG EDGE TO COMM (EAST) 3) OK WATER, FILE RISER AND STEEL BOND |
|
| 06/09/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) 8-4" COMMUNICATION LINES, 2-4" COMMUNICATION LINES AT SOUTH WEST CORNER |
|
| 06/07/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK 4 3", 2 2" AND 1 1" FROM PULL BOX TOWARD BLDG 60' AND FOR TEMP 2) OK NORTHWEST CORNER LIGHTING AND LIGHTING |
|
| 06/03/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* SUN/BERG TRAILER: 1) PROVIDE PLATFORM FOR PANEL 6' 7" HIGHEST BREAKER 2) TRAILER NEEDS MAIN BREAKER 225.31 &32 3) NEED GROUNDING ELECTRODE SYSTEM 2ND STRUCTURE 250.24 & 32 4) OK CONDUITS AT FLOOR G008VW 5) OK 3 PVC 90 DEGREES FOR LIGHTING AT GARAGE 6) OK CONTINUATION OF PVC CONDUIT BLDG EDGE UNDER SLAB EXCEPT FEEDFER 90 DEGREES |
|
| 05/25/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK SECONDARY CONDUITS CONTINUE TO X-FORMER STUB UP 2) OK SITE LTG, TEMP POWER CONDUIT NORTH OF PARKING GARAGE 3) OK HOME RUNS BELOW SLAB ANNEX |
|
| 05/23/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK 3/0 BOND JUMPER FROM I BEAM TO WATER 2) OK PVC STUB UP TO BLDG CORNER TO 10' NORTH FOR POLE LTG. |
|
| 05/17/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) LAST 50' TO PULL BOX NORTH TO SOUTH ON WEST SIDE |
|
| 05/13/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK 5-3", 7-1 1/2" PVC 3/0 TO REBAR FOR STRUCTURAL BOND |
|
| 05/12/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) GL O-TO GENERAL USE ROOM 5-3" BUSS WAY, 4-1 1/4 ELEVATORS AND LIGHTING PANEL, 3-1 1/4 IS AIR HANDLER UNITS |
|
| 05/11/2011 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : The conduit is not installed per code.| 240* DB 120 NOT LISTED CONDUIT RACEWAY 352.6 |
|
| 05/10/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) 2" CONDUIT TEMP, 2- ? TO FIRE ? AND GENERATOR |
|
| 05/09/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) DO NOT COVER MORE THAN 20' SECTIONS-LEAVE OPEN TO INSPECT 2) OK ACROSS ROAD 60' FOR TEMP |
|
| 05/05/2011 | ELECTRIC - UNDERGROUND | Partial Approval | 1) OK PVC CONDUITS IN TRENCH NORTH TO SOUTH 100' WEST SIDE SOUTHWEST CORNER 2) OK DROP DOWN PARKING GARAGE CONDUITS |
|
| 05/03/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 3-1" PVC EAST RAMP DOWN 1- 1 1/2" PVC FOR FIRE PUMP SES OUT 80 OK 1" PVC FOR TEMP LIGHTING |
|
| 05/02/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK 8-4" PVC SES OUT 80' OK 1-2" PVC SES OUT 80' OK 2-1" PVC SES OUT 80' |
|
| 04/26/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 04/25/2011 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 04/19/2011 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 04/18/2011 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |