Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2010 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 10/06/2010 | BUILDING - FINAL | Denied | 1) STRUCTURAL EVALUATION NEEDED FOR BEAM STRAPS NOT INSTALLED INTO A BOND BEAM AT EXISTING WALL 2) POSITIVE CONNECTION REQUIRED FROM DECK TO STRUCTURE 3) INSTALL BACKING AND LAG BOLTS PER PLAN TO SUPPORT GUARD RAILS |
|
| 10/05/2010 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE RECALL |