Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2011 | ENGINEERING - FINAL | Approved | ||
| 04/11/2011 | ENGINEERING - FINAL | Denied | ||
| 04/01/2011 | ENGINEERING - FINAL | Denied | ||
| 03/29/2011 | ENGINEERING - FINAL | Denied | COMPLETE PAVING, SIDWALKS, LANDSCAPE, CALL FOR RE-INSPECTION | |
| 03/28/2011 | ENGINEERING - FINAL | Denied | NOT READY, COMPLETE ALL SITE WORK ASSOCIATED WITH THE BLDG, (STORM WATER DRAINAGE, PARKING, ACCESSS, LOADING AREA, LANDSCAPING, PAVING...). CALL FOR RE-INSPECTION. |