Permit: T10CM02205

Parcel: 99999999A


Addresses:

4320 N ORACLE RD

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
03/24/2011 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
02/14/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) TOP OUT ON EAST TRASH ENCLOSURE
02/08/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1ST LEFT TRASH ENCLOSURE
02/03/2011 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
NOT READY- FROZEN MOTAR
01/12/2011 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) PROGRESS AREA AT LOADING DOCK
12/21/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) TOP OUT ON NORTH WALL
12/20/2010 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
12/17/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CENTER PORTION OF SOUTH CMU WALL AT 22'-4" OK TO GROUT; EAST PIER COLUMNS TOPPED OUT AT 32' OK TO GROUT
12/16/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 16' LIFT ON NORTH WALL
12/15/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 12' LIFT ON NORTH WALL
12/14/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) TOP OUT ON SOUTH EAST COLUMN
12/10/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 2ND LIFT NORTH WALL, 20' LIFT ON 1 COLUMN SOUTH EAST CORNER
12/09/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1ST LIFT NORTH WALL, 24' LIFT ON EAST COLUMNS
12/07/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) EAST SIDE COLUMNS 16' LIFT
11/23/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 12' LIFT ON EAST SIDE COLUMNS
11/22/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 8'-12' ON COLUMNS EAST SIDE, TOP OUT GL 0.5-2/A, 0.5/A-B, 0.5-1/B, B-C/1, 1/D-E, 1-2/E
11/19/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) TOP OUT GL A/2-8; A/A-E, 3/2-8, D-E/1. 26' LIFT
11/18/2010 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
11/17/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 24' SOUTH WALL PENDING RFI ON MISSING BOND WIRE
11/16/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 4' ABOVE BEAM GL E/4.2-6.8
2) MISSING BOND WIRE AT SOUTH WALL AND WEST WALL
11/15/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL A-A.8/0.5 20', 4-8/A 20', 1/E-D 20'
11/12/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 20' LIFT GL 2-8/A; A/A-E, 7-8/E, 1-4/E
11/10/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 16' LIFT AT SOUTH AND NORTH WALLS
11/08/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL A/0.5-4 16' LIFT, 1-5/E 16' LIFT
11/05/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL A/4-8 16', 8/D.5-A. 12'
11/03/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) SOUTH WALL GL: 8/A-E AT 4'-8'; EAST WALL AT 8'-12' GL: E/1-8; N.W. CORNER AT 8'-12' GL: A.8-A/0.5 OK TO GROUT PROGRESS AREAS
11/01/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL E/1-3 8' LIFT, A/2-8 8' LIFT AND 8-7/E 8' LIFT
10/29/2010 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
1) REBAR TO SHORT
10/27/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL 0-3/A 4' LIFT, 3-8/A 8' LIFT; 8/AT A.8 4' LIFT; 2 COLUMNS EAST SIDE 4' LIFT, 1-3/E 4' LIFT 1/E-D 4' LIFT
10/25/2010 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 1-A: A.8/0.5; 0.5/A; 8/D, FIRST LIFT AT 54" OK TO GROUT PROGRESS AREAS
10/20/2010 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
10/15/2010 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*