Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2011 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 09/01/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 08/31/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) NEED TO SEE CLOSET FLANGES, SOLAR AND WATER HEATER AREA 2) DWV WATER TEST THRU ROOF-ALL AREAS OK 3) WATER DISTRIBUTION OK 4) INSULATION IN WALL OK |
|
| 08/30/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) DWV WATER TEST THRU ROOF ALL EXCEPT RESTROOM 602 & 603 2) OVERHEAD HARD LIDS OK (HALLWAYS) 3) COMPLETE ALL INSULATION IN WALL AND PROPERLY SUPPORT ALL WATER PIPING IN WALL-DO NOT COVER WITHOUT REINSPECTION |
|
| 08/29/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :*. 1) BLDG NUMBERS ARE TO BE POSTED ON EACH BLDG FOR THE DURATION OF THE PROJECT 2) #617 & 618 INSULATION INCOMPLETE. BATT INSULATION AND DRY WALL COVERS PIPING. NO PORTION OF ANY WORK MAY BE CONCEALED UNTIL IT HAS BEEN INSPECTED AND APPROVED 3) BATT INSULATION AND DRYWALL COVERS ALL PLUMBING WALLS |
|
| 08/23/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* dwv thru roof water piping restroom 617, 618 only |
|
| 05/23/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NOTES FROM 5/20/11 INSPECTION ARE VOID, THAT INSPECTION WAS FOR BLDG 5 #T10CM01888, BLDG 6 STILL REQUIRES INTERMEDIATE INSPECTION AS OF 5/23/11 |
|
| 05/20/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) DWV AND WATER TEST OK 2) NEED TO SEE CLOSET FLANGES AND INSULATION ON PIPING |
|
| 02/17/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* |