Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/01/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) REPAIR SEWER WITH P1 TO P1 REPAIR COUPLINGS 2) EXPOSE TIE INS AND FITTINGS FOR INSPECTION AND TEST |
|
| 05/16/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) NEED TO SEE SEWER AND SEWER CONNECTION WITH TEST |
|
| 04/11/2011 | PLUMBING - ROUGH, SOIL | Cancelled | CANCELLED PER EDWARD #304-8888 | |
| 04/11/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/09/2010 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 08/06/2010 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 08/04/2010 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED TO EXPOSE AND TIE INTO 4" MAIN TO ESTABLISH THE ELEVATION 2) PROVIDE UNIFORM SLOPE, KEEP PIPING AS LOW AS POSSIBLE SO THAT PIPING IS BELOW THE SLAB 3) PROVIDE APPROVED DRAINAGE FITTINGS INSTALLED IN THE PROPER DIRECTION AND AS REQUIRED BY CODE |