Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/01/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) POINT OF VENT MAY NOT BE BELOW TRAP WEIR 2) I.W. PIPING TO BE APPROVED MAT'L 3) PVC TO HAVE PRIMER AND SOLVANT CEMENT PIPING TO BE SUPPORTED 4) 1" AIR GAP STRICTLY ENFORCED 5) NO VALVES DOWNSTREAM OF VACUUM BREAKER 6) VACUUM RELIEF AT WATER HEATER INSULATION |
|
| 11/21/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE POST YOUR SUITE NUMBER 2) TENANT DOES NOT HAVE PERMISSION TO OCCUPY 3) ESPRESSO MACHINE DRAIN NOT APPROVED 4) PROVIDE BACKFLOW CERT FOR ALL EQUIPMENT 5) PROVIDE METHOD OF STERILIZATION AND PROVIDE CLEAN BACTERIA REPORT 6) THIS IS NOT A PUNCH LIST |