Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/23/2012 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
12/05/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) THE AGGREGRATE CROSS SECTION AT AREA OF VENTING MUST EQUAL THE LONGEST REQUIRED TO BLDG DRAIN, NO VENT ALLOWED UPSTREAM FROM G.W. VALVE 2) TOTAL VENTING FOR SEWER TO BE MINIMUM 3" |
|
11/14/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BACKWATER VALVE TEST WITH VENT FOR DOWNSTREAM SEWER EQUAL TO REQUIRED BLDG DRAIN |
|
08/11/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
07/26/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
06/22/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE CALL IN LSS STRUCTURE ON PERMIT #T10CM00917 |
|
06/20/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
06/16/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) SKIMMER RETURN LINES FOR POOL OK 2) AT BOTH INTERCEPTOR AND SEWER CONNECTION OK |
|
06/15/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED |
|
06/08/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
06/07/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | 1) ADDITION ON P-14 IN STORAGE 110 PER RED LINE ON SITE AND 8 1/2" X 11 WATER TEST THRU CLEANOUT HEIGHT | |
05/17/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) FROM INITIAL PAGE 1 P101 SANITARY DRAINAGE UPSTREAM THRU BLDF WATER TEST THRU CLEANIOUTS |
|
05/16/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST SANITARY DRAINAGE INTERIOR TO 2' EXTERIOR OF BLDG EXCEPT, HORIZONTAL VENTING REQUIRES CORRECT FITTING ORIENTATION WITH DRAINAGE NOT DRAIN ARM |
|
05/09/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 3/4 HOT AND COULD TO 16' HB-2 AT SOUTH/WEST |
|
05/03/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
05/03/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 6" WASTE FROM INITIAL PAGG IP101 TO INITIAL JUST BEFORE INTERLOPTOR WATER TEST. 6" SDR 35 BUILDING SEWER FROM 3' EXTERIOR AIR TEST TO 8" PRIVATE SEWER | |
04/29/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
04/27/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
04/22/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 4" CAPPED DRAIN 75 PSI TEST |
|
04/18/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
04/14/2011 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
04/13/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
04/12/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
04/11/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
04/07/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
04/06/2011 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REPAIR LEAK AT NOZZLE ADAPTER SUPPLY SIDE BUSHING AND RETEST |
|
04/05/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*NOT UNDER TEST AT 8:48AM | |
04/04/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
03/31/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 10" POOL SUPPLY FROM LSS TANK TIEING INTO 10" POOL SUPPLY TO ELEPHANT POND CONTINUATION APP. 100' 2) 4" STREAM SUPPLY STUBBED 20' OUT FROM LSS TANK |
|
03/29/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) PVC SCHEDULE 80-10" POOL DRAIN TIED INTO LSS TANK WITH 100 PSI TEST FROM THAT POINT TO (2) 10" STUB INTO (2) MAIN DRAIN BASINS, ALSO WITNESSED BY BILL ROWLEY (ASHTON) |
|
03/24/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 10" ELEPHANT POOL DRAIN PIPING FROM 80' FROM LSS HOLDING, OBSERVED INSTALLATION. MOVING TOWARD HOLDING PRIOR IS INSTALLED WITHOUT INSPECTION |
|
03/23/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) 10" POOL SUPPLY FROM LSS TO NOZZLES 100 PSI TEST 2) 10" SKIMMER PVC SCHEDULE 80 FROM LSS APP 100' LAYING BEDDING |