Inspection History Details
Inspection Status: Denied
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2010 | FIRE SPKLR - FINAL | Denied | 1. In building C-8 need alarm bell or water motor gong for sprinkler system. 2. Warehouse #2 riser needs sprinkler inspection done. 3. Need 5yr check valve inspections done on all 4 risers. 4. Need to add sprinkler coverage under lofts in building C-8 building. 5. In C-15 building repair or replace alarm bell for sprinkler system. |