Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2011 | GRADING - FINAL | Approved | Approved | |
| 08/24/2011 | GRADING - FINAL | Partial Approval | PARTIAL APPROVAL FOR ENGINEERING FINAL. 1) PROVIDE A CERTIFICATION STATEMNET FROM THE ENGINEER OF RECORD STATING THAT ALL STORM DRAINAGE WAYS WERE CONSTRUCTED PER THE APPROVED PLAN. 2) REMOVE ROLL-OFF 3) REMOVE PORT-O-JONS 4) INSTAL ALL HC SIGNS |