Permit: T10BU01194

Parcel: 13316024P


Addresses:

6350 E GRANT RD

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
08/24/2011 GRADING - INTERMEDIATE Approved
08/09/2011 GRADING - INTERMEDIATE Continued ENGINEERING FINAL NOT READY, SITE HAS GRADING PERMIT #T10BO01194. INSPECTION WAS CALLED FOR INTERMEDIATE GRADING GRADING. CALL FOR RE-INSPECTION WHEN CONSTRUCTION IS COMPLETE.
07/08/2011 GRADING - INTERMEDIATE Continued 1) 6-BUBBLER BOXES INSTALLED PER APPROVED SITE/GRADING PLAN - ALL ROOF MAIN STORM DRAINS TIE INTO BOXES AT VARIOUS LOCATIONS.
2) BUBBLER BOXES ARE 24" SQUARE WITH 6" OF ROCK IN THE BOTTOM.
3) VARIOUS SIZES OF PVC PIPE WAS USED FOR ROOF DRAIN CONVEYANCE TO EACH BOX BASED ON THE SIZE OF THE ROOF DRAIN PIPE.
4) POSITIVE DRAINAGE WAS VERIFIED - OK TO BURY PIPE.
05/19/2011 GRADING - INTERMEDIATE Continued NO SIGNIFICANT SITE WORK BEING DONE, NO STORM WATER CONCERNS
04/18/2011 GRADING - INTERMEDIATE Continued NO SITE WORK YET, CONTRACTOR WORKING ON BLDG ONLY.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
02/17/2011 GRADING - INTERMEDIATE Continued 1) ENSURE MORTAR MIXING ALONG WEST SIDE OF SITE IS CONTAINED BETTER BY BIRMING, OR DEPRESSING THE AREA OR THE USE OF SUPPLEMENTAL SEDIMENT CONTROLS.
2) SWEEP UP ROCKS IN STREET AT CONSTRUCTION ENTRANCE BACK ON TO SITE .

RAIN FORCAST FOR SATURDAY - PERFORM SELF INSPECTIONS ON MONDAY, AND DOCUMENT THEM.
01/28/2011 GRADING - INTERMEDIATE Continued NO CHANGES, NO SITE WORK.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/14/2011 GRADING - INTERMEDIATE Continued NO SITE WORK BEING DONE AT THIS TIME. WORK BEING DONE ON PERIMETER WALL AND CONSTRUCTION OF PRE-FAB BLDG.

INSTALL CONCRETE/MATERIALS WASH OUT AND USE IT.
NO OTHER STORM WATER CONCERNS AT THIS TIME
12/27/2010 GRADING - INTERMEDIATE Continued NO ACTIVITY ON SITE, NO DRAINAGE PROBLEMS AFTER RAIN EVENT. NO STORM WATER CONCERNS AT THIS TIME
12/07/2010 GRADING - INTERMEDIATE Continued CONTRACTOR IN PROCESS OF EXCAVATING AND COMPACTING DIRT FOR BUILDING FOUNDATION. NO SITE WORK TAKING PLACE AT THIS TIME.

PERIMETER SEDIMENT CONTROLS ARE IN PLACE
1) CONTRACTOR MUST ENSURE STOCKPILE IS BENCHED AND SOIL IS PROTECTED FROM LEAVING THE SITE.
2) ENSURE TRACKED SOIL IS ROUTINELY SWEPT.
3) ESURE STORM WATER SELF INSPECTION ARE PERFORMED PER SWPPP AND ARE DOCUMENTED.

CALL FOR ANY REVISIONS TO GRADING PLAN OR SIGNIFICANT CHANGES.