| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2011 | GRADING - INTERMEDIATE | Approved | ||
| 08/09/2011 | GRADING - INTERMEDIATE | Continued | ENGINEERING FINAL NOT READY, SITE HAS GRADING PERMIT #T10BO01194. INSPECTION WAS CALLED FOR INTERMEDIATE GRADING GRADING. CALL FOR RE-INSPECTION WHEN CONSTRUCTION IS COMPLETE. | |
| 07/08/2011 | GRADING - INTERMEDIATE | Continued | 1) 6-BUBBLER BOXES INSTALLED PER APPROVED SITE/GRADING PLAN - ALL ROOF MAIN STORM DRAINS TIE INTO BOXES AT VARIOUS LOCATIONS. 2) BUBBLER BOXES ARE 24" SQUARE WITH 6" OF ROCK IN THE BOTTOM. 3) VARIOUS SIZES OF PVC PIPE WAS USED FOR ROOF DRAIN CONVEYANCE TO EACH BOX BASED ON THE SIZE OF THE ROOF DRAIN PIPE. 4) POSITIVE DRAINAGE WAS VERIFIED - OK TO BURY PIPE. |
|
| 05/19/2011 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT SITE WORK BEING DONE, NO STORM WATER CONCERNS | |
| 04/18/2011 | GRADING - INTERMEDIATE | Continued | NO SITE WORK YET, CONTRACTOR WORKING ON BLDG ONLY. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
| 02/17/2011 | GRADING - INTERMEDIATE | Continued | 1) ENSURE MORTAR MIXING ALONG WEST SIDE OF SITE IS CONTAINED BETTER BY BIRMING, OR DEPRESSING THE AREA OR THE USE OF SUPPLEMENTAL SEDIMENT CONTROLS. 2) SWEEP UP ROCKS IN STREET AT CONSTRUCTION ENTRANCE BACK ON TO SITE . RAIN FORCAST FOR SATURDAY - PERFORM SELF INSPECTIONS ON MONDAY, AND DOCUMENT THEM. |
|
| 01/28/2011 | GRADING - INTERMEDIATE | Continued | NO CHANGES, NO SITE WORK. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 01/14/2011 | GRADING - INTERMEDIATE | Continued | NO SITE WORK BEING DONE AT THIS TIME. WORK BEING DONE ON PERIMETER WALL AND CONSTRUCTION OF PRE-FAB BLDG. INSTALL CONCRETE/MATERIALS WASH OUT AND USE IT. NO OTHER STORM WATER CONCERNS AT THIS TIME |
|
| 12/27/2010 | GRADING - INTERMEDIATE | Continued | NO ACTIVITY ON SITE, NO DRAINAGE PROBLEMS AFTER RAIN EVENT. NO STORM WATER CONCERNS AT THIS TIME | |
| 12/07/2010 | GRADING - INTERMEDIATE | Continued | CONTRACTOR IN PROCESS OF EXCAVATING AND COMPACTING DIRT FOR BUILDING FOUNDATION. NO SITE WORK TAKING PLACE AT THIS TIME. PERIMETER SEDIMENT CONTROLS ARE IN PLACE 1) CONTRACTOR MUST ENSURE STOCKPILE IS BENCHED AND SOIL IS PROTECTED FROM LEAVING THE SITE. 2) ENSURE TRACKED SOIL IS ROUTINELY SWEPT. 3) ESURE STORM WATER SELF INSPECTION ARE PERFORMED PER SWPPP AND ARE DOCUMENTED. CALL FOR ANY REVISIONS TO GRADING PLAN OR SIGNIFICANT CHANGES. |