Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) SILT SOCK HAS BEEN INSTALLED ALONG PERIMETER AS SHOWN ON SWPPP - ENSURE SILT SOCK OVERLAPS EACH SECTION WHEN INSTALLED. 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE ALONG WILMONT ROAD. 3) POST A COPY OF YOUR AZCON AUTHORIZATION NUMBER ON SITE. 4) ENSURE PERIODIC STORM WATER MAINT SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 5) SWEEP UP ANY TRACKED SOIL OFF PUBLIC ROADWAYS AS NEEDED. |
|
| 11/09/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | 1) CONSTRUCTION ON SITE HAS BEEN DELAYED DUE TO THE FACT THAT OLD INERT CONSTRUCTION MATERIAL HAS BEEN FOUND ON SITE AND IS BEING REMOVED. 2) DEMO WORK IS STILL BEING ACCOMPLISHED. 3) DUE TO THE FACT THAT DEMO WORK DISTURBED OVER AN ACRE OF LAND, SEDIMENT CONTROLS ARE REQUIRED AT THE PROPERTY BOUNDRY 4) SEDIMENT CONTROLS ARE BEING INSTALLED AS OF TODAY 5) CONTRACTOR MUST CALL IN FOR A PRE-CON INSPECTION PRIOR TO CONSTRUCTION. |