Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 03/15/2012 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
|
| 02/15/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NO TRACK OUT. |
| 09/09/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Some track out into parking lot SE of project. |
| 08/17/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Storm controls in place and in good cond. |
| 07/07/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Reminded contractor of monsoon weather and to keep an eye on track out. |
| 04/26/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Followed up on a complaint about track out from site, did not see any tract out however the curb line has started to have considerable build up of dirt, probably caused by the wind. I asked contractor to clean up curb line. |
| 04/19/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls in place and in good cond. |
| 03/23/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Need to restore straw waddel in SW corner of project near wash. |
| 02/09/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Gave Ashton a correction notice to sweep street at construction entrance. |
| 01/19/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Asked contractor to install SWPP copntrols along nW premeter |