Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CORRECT BOND OF BLDG GAS SYSTEM, YOU CAN USE A SPLIT BOLT TO THE EXISTING GROUNDING WIRE (CLEAN IT 1ST) YOU CANNOT HAVE 2 WIRES UNDER THE SAME LUG IN DISCONNECT BOX 2) SEAL T & P DRAIN HOLE THRU BLDG EXTERIOR 3) PROVIDE APPROVED DBL WALL VENT CAP |