Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/10/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/31/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE PROPER DIRECTION OF FLOW AND APPROVED CRIMP JOINTS WITH PROPER MAKE UP ON VENT CONNECTORS 2) OWNER OR OWNERS REP IS REQUIRED TO COMPLETE A PETITION OF APPEAL FORM 3) AGA GAS VALVE REQUIRED 4) TYPE B VENT REQUIRED, TERMINATE 1' ABOVE SIDE WALL OF A/C UNIT |
|
| 07/13/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A SEDIMENT TRAP AT GAS ENTRY TO APPLIANCE 2) PROVIDE A DRIP PAN WITH APPROVED PIPING FOR TEMPERATURE AND PRESSURE RELIEF TERMINATING 1" ABOVE TOP LIP OF DRAIN PAN. PROVIDE PLUG IN DRIP PAN, AND CITY SIGNED PETITION OF APPEAL FOR ALTERNATE FORM OF TEMPERATURE AND PRESSURE RELIEF ON COLD INLET TO BLDG 3) PROVIDE A NEW RATED GAS FLEX TO WATER HEATER 4) REMOVE TAPE FROM ALL VENT JOINTS AND PROVIDE APPROVED FASTENERS AT ALL VENT JOINTS 5) PROVIDE DBL WALL VENT CONTINUATION TO APPROVED VENT CAP MINIMUM 3' ABOVE AIR INTAKE ON ROOF |