Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case: T09FR02535

Parcel: 12405007B


Addresses:

845 E UNIVERSITY BL

Inspection Status: Correction Required

Inspection History: INSP - FULL

Date Description Inspector Results Comments
07/30/2009 INSP - FULL Correction Required DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE REPAIRED WITHIN 30 DAYS. A COPY OF THE REPAIR WORK SHALL BE FORWARDED TO THIS OFFICE

1) SPRING NAIL SALON - THE PAINTED QUICK RESPONSE SPRINKLER HEAD IN THE STORE ROOM SHALL BE REPLACED

2) PEI WEI - ALL RECESSED SPRINKLER HEADS SHALL HAVE THE MISSING RECESSED STYLE ESCUTCHEONS MISSING SHALL HAVE THEM REPLACED

3) PITA PIT - RECESSED SPRINKLER HEAD ESCUTCHEONS THAT ARE MISSING SHALL BE REPLACED ( 2 PLACES)

4) PRESSURE GUAGES ARE 5 YEARS OLD AND SHALL BE REPLACED OR CALIBRATED

5) THE 5 YEAR INTERNAL VALVE INSPECTION IS DUE