Inspection History Details
Inspection Status: Correction Required
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2009 | INSP - FULL | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCIES WERE FOUND AND SHALL BE CORRECTED WITHIN 30 DAYS. A COPY OF THE REPAIR ORDER SHALL BE FORWARDED TO THIS OFFICE 1) GUAGES ARE DUE FOR REPLACEMENT OR CALIBRATION 2) THE ALARM VALVE IS DUE FOR THE 5 YEAR INTERNAL INSPECTION 3) TW0 (2) 165 DEGREE SIDEWALL SPRINKLERS TO BE ADDED TO THE HEAD BOX. 4) SPRINKLERS THAT ARE DAMAGED, CORRODED, PAINTED OR LEAKING SHALL BE CHANGED OUT. |