Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2011 | INSP - FOLLOW UP CODE ENFORCE | Approved | Permit finaled. Case compliant, close. | |
| 08/02/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | visited site, found interior walls stripped down to the framing exposing all plumbing and electrical, and the front carport area concrete ready to pour for carport enclosure and rear porch of house concrete ready to pour for laundry room addition. * checked permits plus, found permit has been issued to owner / builder, #T10CM00636 and does not expire until 1/29/2011. f/u insp sheduled for 1/04/2011 |
|
| 05/05/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | REVISITES SITE, FOUND LITTLE HAD BEN DONE SINCE THE INTERIOR DEMOLITION WHICH WAS PERMITTED.CALLED AND SPOKE TO ADAN ADAMS OF VISTA RESTORATION, ADAN MENTIONED THAT THE HOLD UP CAME FROM THE INSURANCE COMPANY, BUT THAT PLANS HAVE BEEN SUBMITTED AND PERMIT SECURED, ACTION COMPLETED IN MID- APRIL. CHECKED P+ AND DID FIN PERMITT WAS ISSUED ON 4/14/10. SOY OF PERMIT PLACED IN CASE FILE. SCHEDULE F/U INSP FOR A 90 DAY FOLLOW UP. | |
| 02/04/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | PRIOR TO INSPECTION FOUND COMBO PERMIT (T10CM00095) HAD BEEN ISSUED FOR THE PROPERTY WHICH INCLUDED INTERIOR DEMO. VISITED SITE FOUND VISTA RESTORATION WAS ONSITE, DEMOLITION WAS IN PROCESS. SPOKE WITH JOSH WHO GAVE ADAN ALLEN'S INFORMATION AS PROJECT SUPERINTENDENT. CALLED AND SPOKE TO ADAN WHO MENTIONED PERMITS WERE SECURED SO THAT THE DEMOLITION PROCESS COULD BE COMPLETED, PLANS HAVE BEEN DRAWN AND HOPES PERMITS WILL BE OK'ED BY PLAN CHECK NEXT WEEK NO LATER THAN 2/15/10. COPY OF PERMIT PLACED IN CASE PACKET. |