Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 12/16/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1" CLEARANCE REQUIRED AT WATER HEATER B-VENT TO COMBUSTIBLE 2) PTR LINE SHALL EXTEND TO EXTERIOR OF STORAGE AND DISCHARGE DOWNWARD 6" MIN 24" MAX FROM THE GROUND. COPPER, GALV. OR CPVC PIPE 3) REPLACE ALL PVC WATER LINES ABOVE GROUND WITH COPPER CPVC OR GALVENIZED LINES 4) 3 SCREWS REQUIRED AT ALL VENT JOINTS AT WATER HEATER 5) SEDIMENT TRAP MISSING AT WATER HEATER GAS LINE 6) EXPOSE J-BOXES AT ELECTRICAL FOR INSPECTION |