Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 12/16/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) HAVE ELETRICAL INSPECTION ADDED TO THIS PERMIT CARD FOR NEW ELECTRIC CIRCUIT 2) PROVIDE GREEN WIRE FOR GROUND CIRCUIT 3) HOT & COLD POTABLE WATER PIPING RE-ROUTED TO WATER HEATER LOCATION TO BE INSULATED PROPERLY, JOINTS SEALED AND INSULATION PROTECTED FROM SUNLIGHT DAMAGE 4) PANEL AND PANEL PIPING SHALL BE ELEVATED MINIMUM 1 1/2" ABOVE ROOF SURFACE 5) ALL J-HOOKS DRIVEN DIRECTLY INTO ROOF TO BE REMOVED AND HOLES PATCHED 6) PIPING FOR PANEL IS NOT GRAVITY DRAIN BACK TO DRAIN BACK TANK AS REQUIRED 7) NORTH EXPOSURE OF THE SOLAR PANEL IS NOT TYPICAL INSTALLATION 8) LOW VOLTAGE SENSORE WIRE SHALL BE PROTECTED FROM DAMAGE 9) INSULATE HOT PIPING FROM DRAIN BACK TANK EXCHANGER TO AVOID POSSIBILITY OF BURNS TO CHILDREN |