Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 03/19/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) THERE IS A SLIGHT LEAK AT HEAT EXCHANGER CONNECTION TO WATER HEATER DRAIN 2) ALSO YOUR APPROVED PLAN DOE NOT SHOW THIS HEAT EXCHANGER ASSEMBLY, BUT RATHER INDICATES A SOLAR STORAGE TANK WITH SEPERATE CONNECTIONS FOR HEAT EXCHANGER 3) PROVIDE A DETAIL FOR FAFCO PANELS ON A FLAT ROOF 4) MORE SUPPORTS ARE NEEDED TO KEEP TUBING OFF ROOF 5) ALSO DIAGRAM PROVIDED IS MISSING KEY CHART EXPLAINING WHAT EACH SYMBOL REPRESENTS 6) IS SYSTEM PUMPED ? |
|
| 12/11/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A PERMIT FOR NEW ELECTRICAL WIRING 2) PROVIDE A CITY APPROVED PLAN WITH PIPING DIAGRAM FOR INSTALLATION 3) BRASS OR DIELECTRIC PROTECTION AT WATER HEATER DRAIN CONNECTION 4) MIXING VALVE REQUIRED 5) PIPING NOT SOLDERED AT T & P VALVE 6) SOLAR PANEL AND ALL PIPING SHALL BE SUPPORTED WITH CLEARANCE ABOVE FLAT ROOF, WHERE NAILS HAVE BEEN DRIVEN INTO ROOFING, THE ROOF SHALL BE PROPERLY PATCHED |