Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/08/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE PROVIDE THE SRCC OG-300 PLAN THAT IS CITY OF TUCSON APPROVED FOR THIS SITE SPECIAL INSTALLATION (PIPING DIAGRAM) |
|
| 12/21/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE CORRECT COLOR WIRE FOR NEW CIRCUIT TO WATER HEATER 2) LOCATE DISCONNECT WITH CORRECT CLEARANCE PER 2006 NEC REQUIREMENTS 3) PROPERLY SECURE UPPER PIPING FOR DRAIN BACK TANK 4) IF FITTINGS ARE USED ON ROOF TOP THEY ARE TO BE UV LISTED FOR EXPOSURE TO SUNLIGHT AS IS TUBING 5) WHERE IS TEMPERING VALVE PER PLAN TO AVOID SCALDING ? |