Inspection History Details
Inspection Status: Partial Approval
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2009 | ROOF NAILING | Partial Approval | IVRS - Inspection :* 1) FROM LAST INSPECTION, ROOF NAILING TO LEDGER THAT TIES THE STRUCTURE TO THE LEDGER, OR ALL YOU HAVE ARE 10D TECOS, I SEE THE SCREWS AT A TOE NAIL HOW LONG ARE THEY ? 2) YOU NEED TO TREAT 2 X 4 PLATES WITH A WOOD PRE-SERVATIVE AT COLS SHOULD HAVE USED TREATED LUMBER 3) PATIO DOOR WAS THAT INSTALLED RECENTLY ? IF SO NOT ON PLAN NEED HEADER 4) GRD SCREW AT METAL BOX CEILING-BOND BOX |