Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2011 | ENGINEERING - FINAL | Approved | ||
| 05/18/2011 | ENGINEERING - FINAL | Continued | PRIOR TO FINAL APPROVAL FOR ENGINEERING PROVIDE A CERTIFICATION STATEMENT FROM THE ARCHITECT OF RECORD STATING THAT THE FRENCH DRAIN PIPING WAS INSTALLED PROPERLY AND IS ACEPTABLE. PROVIDE DOCUMENTATION STATING THAT THE PEDESTRIAN ACCESS OFF OF MIRACLE MILE IS ACCEPTABLE. |
|
| 04/20/2011 | ENGINEERING - FINAL | Continued | COMPLETE SITE WORK PER YOUR APPROVED SITE PLAN OR PROVIDE AN APPROVED SITE PLAN THAT SHOWS WHAT WAS BUILT. | |
| 11/16/2010 | ENGINEERING - FINAL | Continued | CONTRACTOR ASKING FOR HELP IN DESIGNING AND INSTALLING STORM DRAIN SYSTEM -SITE REQUIRES A GRADING PERMIT AND PLAN. ENSURE STORM DRAINAGE SYSTEM IS CERTIFIED BY A PE PRIOR TO FINAL |
|
| 11/12/2010 | ENGINEERING - FINAL | Continued | 1) COMPLETE SITE WORK PER YOUR APPROVED SITE/DEVELOPMENT PLAN, AND/OR PROVIDE AN APPROVED PLAN THAT SHOWS WHAT WILL BE CONSTRUCTED. 2) PROVIDE A REVISED/APPROVED PLAN FOR ANY SIGNIFICANT CHANGES TO THE SITE. 3) CALL FOR INSPECTION OF DRAINAGE PIPE PRIOR TO COVERING/BACKFILLING. 4) INSTALANDSCAPING PER PLAN. |