Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2011 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* | |
| 11/15/2010 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) CLOSET FLANGES OK |
|
| 11/10/2010 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 10/06/2010 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) BACKWATER VALVES INSTALLED WHERE THE BLDG DRAIN CONNECTS TO THE BLDG SEWER AT EACH UNIT, INSTEAD OF ONE VALVE DOWNSTREAM OF ALL THE UNITS |
|
| 10/04/2010 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) PROVIDE TRANSIT READINGS FOR UPSTREAM MANHOLE AND FLOOR LEVELS OF ALL BLDGS WITH A BACK WATER VALVE 2) WHERE ARE THE 2 WAY CLEANOUTS WHERE THE BLDG DRAIN MEETS THE BLDG SEWER |
|
| 07/30/2010 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) DOOR AND GATE LOCKED |
|
| 06/14/2010 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* 1 - ABS DWV WATER TEST OK 2 - INSULATE ABS FROM METAL STUDS ADD SUPPORTS AS NECESSARY 3 - PLUMBERS TAPE NOT APPROVED |
|
| 03/19/2010 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* |