Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2010 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/20/2010 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) POST YOUR ADDRESS 2) ALL PIPING IS TO BE LAID ON A FIRM BED (NO BRIDGING) AND SHADED WITH CLEAN FILL 3) WATER LINE REQUIRES SHUT OFF BELOW GRADE OUTSIDE BLDG 4) USE APPROVED 2 WAY CLEANOUT FITTING, CLEANOUTS TO OPEN IN THE DIRECTION OF FLOW 5) OK TO BACK FILL SEWER AFTER YOU FINISH SHADING WITH CLEANFILL |