Address Search: 645 W PLATA ST
Search
Parcel Attributes
| Parcel | 115151810 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 3 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 645 W PLATA ST
Date - 08/17/2026 1:45 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 645 W PLATA ST
Date - 08/17/2026 1:45 p.m.
Total Number Of Permits - (8)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1222-00233 | Complete | 12/05/2022 | 05/11/2024 | Commercial Building | Divide warehouse into 7 spaces. | |
| T09BU01283 | FINAL | 08/27/2009 | 12/07/2020 | GRADSWPP | GRADING:65CY CUT & 58CY FILL | |
| T09CM02290 | C OF O | 08/27/2009 | 03/08/2014 | COMBO | NEW METAL BUILDING | |
| T10EX00429 | CLOSED | 08/25/2010 | 10/24/2010 | EXCAV | EXCA:82'OF5' WIDE SIDEWALK & DRIVEWAY APRON ALONG PLATA CONSTRUCTING A CURB ACCESS RAMP | |
| T11EX00487 | CLOSED | 09/14/2011 | 11/13/2011 | EXCAV | INST 48LF X 5' WIDE SIDEWALK | |
| T12PL00108 | VOID | 01/19/2012 | N/A | PLUMB | INSPECT TOILET RING - FRENCH DRAIN FOR COOLERS | |
| T14TC03290 | FINAL | 12/15/2014 | N/A | BARRICAD | Tucson Water Maintenance Daily 12-08-14 | |
| T20RW00230 | FINAL | 01/15/2020 | 04/24/2020 | ROW | N.638107 - TRANSFER 1 MAIN CABLE, 2 AERIAL SERVICE DROPS, REMOVE AND INSTALL 1 POLE MOUNTED TERMINAL. (METAL). INSTALL 1 CABLE GROUND, 1 POLE TAG. REMOVE AND INSTALL 1 DOWN GUY, ANCHOR, AND GUARD. PULL OLD POLE. |
Code Enforcement
Address: 645 W PLATA ST
Date - 08/17/2026 1:45 p.m.
Total Number Of Code Cases - (1)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO1122-00714 | Closed - Resolved | 11/29/2022 | 11/14/2023 | RWOP / Lots of building activity, inside and out, including, new offices inside, with new electrical, HVAC work,, removing large garage door, enlarging a door, adding a outdoor structure |