Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2010 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) WATER TEST DWV UNDERGROUND AND THRU ROOF AT (4) STOOL (2) LAV RESTROOM OK 03035-DWV TEST STILL REQUIRED ON (S-1 EMPLOYEE LOUNGE) AND MAINTANCE TOILET. THRU ROOF ONLY |
|
| 02/24/2010 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST UNDERGROUND FROM POINT OF CONNECTION TO EXISTING THROUGH NEW BUILDING ???? P1.0 |