Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2010 | ENGINEERING - FINAL | Approved | HOLD GRADING BOND TILL GRADING PERMIT FINALED FOR SITE | |
| 04/05/2010 | ENGINEERING - FINAL | Partial Approval | SITE HAS BEEN CHECKED TO VERIFY THAT THE CHANGES HAVE BEEN MADE TO ALLOW FOR THE TEMPORARY C OF O. | |
| 04/01/2010 | ENGINEERING - FINAL | Partial Approval | THE SITE HAS BEEN CHECKED AND THE FOLLOING ITEMS HAVE BEEN NOTED. 1) STRIPING OF THE PARKING LOT HAS NOT BEEN DONE FULLY WITHIN THE DEVELOPMENT STANDARDS. A FEW OF THE SPOTS ARE CURRENTLY LESS THAN THE REQUIRED WIDTH AND WILL BE MARKED OUT SO THAT THEY CANNOT BE UTILIZED. 2) THE LIP ON THE HANDICAP ACCESS RAMP INTO THE BUILDING IS TO HIGH AND NEEDS TO BE GROUND DOWN TO BE WITHIN TOLERANCES. 3) THE BICYCLE LOCKERS HAVE BEEN SET IN A MANNER THAT WILL NOT ALLOW THE MINIMUM REQUIRED SIDEWALK IN THE ADJACENT AREA. THESE WILL BE SHIFTED THIS WEEKEND IN A MANNER THAT WILL ALLOW THE PROPER SPACE FOR THE ADJACENT PEDESTRIAN ACCESS POINTS. A RE-INSPECTION OF THE SITE WILL BE DONE ON 4/5/2010 TO ENSURE THAT ALL THE WORK HAS BEEN COMPLETED PRIOR TO THE ISSUANCE OF THE TEMPORARY CERTIFICATE OF OCCUPANCY ON 4/7/2010. |
|
| 03/30/2010 | ENGINEERING - FINAL | Denied | CHECKED THE SITE FOR COMPLETION FOR THE PARTIAL RELEASE. ALL EXTERIOR WORK ON THIS SITE NEEDS TO BE COMPLETED PRIOR TO REQUESTING ANOTHER INSPECTION. ONCE THE EXTERIOR WORK IS COMPLETED A PARTIAL RELEASE WILL BE GIVEN, BUT A FINAL WILL NOT BE GRANTED UNTIL THE REVISED DRAWINGS FOR THE FULL SITE HAVE BEEN RECEIVED TOO ENSURE THAT ALL WORK IS DONE COMPLETELY PER ALL APPROVED PLANS. |