Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2010 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 01/07/2010 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 12/29/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | 1) WATER TEST FROM BLDG THRU TO EXISTING SEWER CONNECTION OK-PENDING COMBUSTION WASTE AND VENT (SYSTEM) TO BE INSTALLED PER DETAIL 1 ON P-3 FOR VENTING OR IF PLAN IS AN INTERNATIONAL PLUMBING CODE PLAN PROVIDE PETITION OF APPEAL FROM BLDG OFFICIAL 2) CONNNECTION TO EXISTING SEWER MAIN IS LEAKING AND REQUIRES CORRECTION 3) 4" SEWER IS STUBBED OVER TO ? TANKS |