Permit: T09CM01671

Parcel: 141113820

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
02/24/2011 ENGINEERING - FINAL Approved DISCUSSED PARKING LOT CHANGES WITH LAITH ALSHAMI TO ENSURE THAT THE CHANGES WOULD NOT AFFECT THE PAAL ACCESS INTO THE BUILDING.
02/14/2011 ENGINEERING - FINAL Partial Approval MET CHRIS ON SITE AND WALKED THROUGH TO SEE IF ALL OF THE ITEMS HAVE BEEN ADRESSED FOR THIS SITE AND PLACED ON THE AS-BUILT DRAWINGS FOR THIS SITE. CHRIS WILL ADVISE WHEN ALL OF THE INSPECTIONS HAVE BEEN COMPLETED AND THE PLANS HAVE BEEN APPROVED.
12/01/2010 ENGINEERING - FINAL Continued SITE NOT READY AT THIS TIME, CHANGES HAVE BEEN MADE TO THE SITE THAT ARE NOT REFLECTIVE ON THE APPROVED SITE AND GRADING PLANS. APPROVED REVISIONS OF THE SITE WILL NEED TO BE PROVIDED FOR THIS FINAL INSPECTION.