Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2011 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 05/17/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) 2ND FLOOR ABOVE CEILING OK TO COVER DUCT |
|
| 04/26/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 04/05/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* LAB MIDDLE 1T FLOOR DUCT OK TO COVER 2ND FLAR SOUTH WALL LINED OK TO COVER | |
| 03/29/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) LAB WEST 1ST FLOOR NORTH SIDE DUCT ABOVE CEILING OK TO COVER 2) LAB EAST 1ST FLOOR NORTH SIDE DUCT ABOVE CEILING OK TO COVER 3) INSULATE ALL UN-LINED SQUARE TO ROUNDS ON SUPPLY |
|
| 03/11/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 03/09/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) LINEAR CANS ARE TO BE INSULATED 2) VAV-124 HAS NO ACCESS TO CONTROL PANEL 3) NO COMBUSTIBLE MATERIALS IN RETRUN PLENUM ( ? BLOCKS) |
|
| 03/03/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) WOMENS AND MENS RESTROOMS 1ST FLOOR OK |
|
| 03/02/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) WOMEN'S AND MEN'S RESTROOMS 2ND FLOOR SUPPLY AND EXHAUST OK 2) 100 PSI HYDROSTATIC ON HOT WATER REHEAT FROM SHUT OFF VALVES TO VAV'S AND LS UNITS OK INSULATE 1ST FLOOR ONLY |
|
| 02/10/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 02/09/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection : 1. ALL FIRE/SMOKE DAMPERS ARE TO BE FRAMED OUT ON ALL SIDES PER MASNUFACTURES INSTALLATION INSTRUCTIONS, PROVIDE MANUFACTURE INSTALLATION INSTRUCTIONS FOR NEXT INSPECTION ALL DAMPER FRAMING TO BE EXPOSED FOR INSPECTION |
|
| 02/08/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* HARD LIDS 1ST GEAR OK DUCT 1ST FLOOR OK TO INSULATE |
|
| 02/02/2011 | MECHANICAL - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* | |
| 01/06/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 12/16/2010 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) FUTURE HYDRO PIPING FROM MECH ROOM TO FIRING RANGE PRESS. TEST OK, OK TO INSULATE |
|
| 11/23/2010 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) SUSPENDED ROUGH DUCT MAIN TRUNK LINE 2ND FLOOR MEDIUM PRESSURE OK TO INSULATE |
|
| 11/15/2010 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) MED PRESS 1ST FLOOR OK TO WRAP |