Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/19/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) SOIL PIPING WITH TEST, ONCE RISER OK 2) THERE IS A PLAN DISCREPENC; PLUMBING FIXTURE SCHEDULE SPECIFIES A 2" WASTE CONN FOR FIXTURE P4 3) PLUMBING ISO DOES NOT SHOW DRAIN FOR WATER COOLER 4) PLEASE VERIFY NEED FOR DRAIN OR NOT PRIOR TO CONTINUING 5) AS A REMINDER, SCHEDULE ALL REQUIRED INSPECTIONS AT APPROPRIATE TIMES |