Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 07/19/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 01/12/2010 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 11/25/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) NEW PIPING WITH TEST IS OK 2) PROVIDE INSTALLATION INSTRUCTIONS FOR BOSCH WH 3) VENTING MAY NOT BE RIGHT 4) CALL FOR MECHANICAL INSPECTION OF NEW FAU AND CORRECTLY SIZED FLEX |
|
| 10/29/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) INSTALLED PER PLAN, YOU OK TO BURY GAS PIPING 2) COMPLETE THE PIPING TO YOUR WATER HEATER AND FURNACE 3) SEE NOTE #5 FROM INSPECTION DONE ON 10/13/09 |
|
| 10/23/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1 S?? PIPE MACHINE JAW MARKS IN 3 PLACES. TAPE PRIOR TO COVERING 12 PSI OK DO YOU HAVE PLAN FOR SIZING? NO ACCESS TO ROOF. NO ONE HOME. |
|
| 10/15/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO CHANGE FROM INSPECTION ON 10/13/09, PLEASE SEE THE NOTES AND MAKE ALL CORRECTIONS |
|
| 10/13/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST TO HOLD MINIMUM 15 MINUTES WITH NO LOSS OF PRESSURE 2) PLEASE PROVIDE TEST GAUGE IN 1/10 POUND INCREMENTS 3) SUPPORT GAS PIPING UP WALL AND ON ROOF AT CORRECT INTERVALS 4) PROVIDE PIPE PRIMER THEN TAPE ALL TOOL MARKS AND UNDERGROUND FITTINS TO ARCHIEVE 40 MIL WRAP OF TAPE TO 6" ABOVE FINISH GRADE 5) NOTE: FROM THE LOCATION OF YOUR WATER HEATER GAS VALVE IF YOU INSTALL A WATER HEATER THAT IS INSTANTANOUS HOT (LIKE RANNI) YOUR PIPING MAY BE UNDER SIZED |