Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UFER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2010 | ELECTRIC - UFER | Approved | IVRS - Inspection :* | |
| 09/15/2009 | ELECTRIC - UFER | Partial Approval | IVRS - Inspection :* 1) BOND WATER AND GAS PIPING 2) USE PROPER FITTINGS FOR LOAD CONDUIT TERM INTO ENCLOSURE 3) USE INSULATED BUSHING TO PROTECT CABLE FROM ABRAISON AT END OF CONDUIT ABOVE PANEL 4) SUPPORT ROMEX INSIDE ADDITION PER CODE-USE APPROVED FAN BOX, BUSHINGS ON ENDS OF WIREMOLD TO PROTECT ROMEX, NAIL PLATES WHERE NECESSARY 5) FEED TO ADDITION NOT RUN YET |
|
| 09/14/2009 | ELECTRIC - UFER | Not ready for Inspection | IVRS - Inspection :* |