Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
Permit Number - T09CM00849
Inspection Description - SITE - SEWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/30/2010 | SITE - SEWER | Approved | IVRS - Inspection :* | |
09/16/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
09/14/2010 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* 1) UNABLE TO LOCATE SITE UTILITY PLAN (APPROVED) |
|
08/30/2010 | SITE - SEWER | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE C.I. PIPING ON C.I. PIPING SYSTEM, WITH PIPING IN CORRECT ALLIGNMENT, WITH APPROVED TRANSITION OR LISTING FOR CONNECTION FROM C.I. TO SDR 35 |
|
03/19/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) INSTALL TRACER WIRE FROM MANHOLE TO 2 WAY CLEANOUT 2) REMOVE BROKEN MASONRY FROM CONNECTION AT TOILET ROOM B-107 3) OK TO COVER CONNECTION OUTSIDE LOCKER ROOMS |
|
03/18/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 4" SDR 35 EXTENDED FROM EXISTING TO POC WITH BLDG DRAIN OUTSIDE LOCKER ROOMS OK 2) BLDG DRAIN NOT CONNECTED TO BLDG SEWER 3) 4" SDR 35 EXTENDED FROM POC WITH EXISTING SEWER TO JUST OUTSIDE TOILET ROOM B107 BUT NOT CONNECTED TO BLDG DRAIN 4) WATER TEST OK 5) OK TO BACKFILL THESE TWO AREAS |
|
09/02/2009 | SITE - SEWER | Partial Approval | 1) 4 PSI AIR TEST OK | |
08/31/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 4" SDR 35 CONTINUES NORTH THRU CLEANOUT #2 TO CLEANOUT #1 WHICH IS 2 WAY, BEDDING LAYING, GRADE, SHADE AND TRACER 2) WILL AIR TEST AT LATER DATE |
|
08/28/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 4" FROM EXISTING SOUTH EAST 8" THRU TO CLEANOUT #3 PER RED PAGES CLEANOUT 1.3 SERVING AS RED LINE DRAWING BECAUSE OF SITE CONDITIONS. THIS PLAN NEEDS PLAN CHECK STAMP 2) PROVIDE CORRECT TRANSITION COUPLINGS FOR SDR TO DUCTILE. WILL AIR TEST AT LATER DATE 3) VERIFICATION OF GRADE DONE ON SITE |