Permit: T09CM00443

Parcel: 133420570

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
01/06/2010 ENGINEERING - FINAL Approved MET ON-SITE AND DISCUSSED THE PROPOSED CHANGES THAT THEY WILL BE MAKING TODAY TO ELIMINATE THE CURRENT DRAINAGE ISSUES. THEY WILL BE INSTALLING A 4 INCH SCUPPER IN THE SIDEWALK ON THE WEST SIDE OF THE STRUCTURE, ADJACENT TO A DOWN DRAIN OUTLET AND WILL PROVIDE A CURB CUT TO ALLOW FOR THE DRAINAGE OF THE WATER TO PREVENT ACCUMULATION AROUND THE SIDEWALK OR THE HOUSE FOOTER.
ON THE EAST SIDE OF THE STRUCTURE THEY WILL CREATE A WATER HARVESTING BASIN WITH A FLAT OUTLET TO ALLOW THE WATER TO FLOW AWAY NATURALLY IN A SHEETFLOW PATTERN. I WILL RE-INSPECT THE SITE ONCE ALL THE WORK IS COMPLETE TO ENSURE THAT THE WORK HAS NOT CREATED ANY HEALTH AND SAEFTY ISSUES.
12/29/2009 ENGINEERING - FINAL Partial Approval PERFORMED A FIELD TRIP TO OBTAIN ADDITIONAL INFORMATION AND THEN DISCUSSED THE AREA ISSUES WITH LOREN MAKUS. WE LOOKED AT THE SITE AND HAVE AGREED THAT THE PROBLEMS AT HAND ARE MINOR AND CAN BE ADDRESSED OUT IN THE FIELD AND PORTION OF THE PLAN ADJUSTED TO REFLECT THE CHANGES WITH "AS-BUILT DRAWINGS".
12/28/2009 ENGINEERING - FINAL Partial Approval MET ON-SITE WITH THE DEVELOPER AND DISCUSSED WHAT IT WOULD TAKE TO APPROVE THIS SITE. THE ROOFDRAINAGE HAS BEEN DIRECTED EITHER ONTO OR ACROSS THE PEDESTRIAN ACCESS AREAS. THEY WILL NEED TO CREATE SOME AREAS FOR WATER HARVESTING ALONG THE SOUTH AND SOUTHEAST SIDE, AND PROVIDE POSITIVE DRAINAGE UNDERNEATH THE SIDEWALK ON THE SOUTHWEST SIDE OF THE PROPERTY TO HELP PREVENT WATER FROM STANDING ADJACENT TO THE BUILDING FOUNDATION. I WILL GO BY THE SITE AGAIN IN THE FUTURE TO ENSURE THAT CHANGES HAVE BEEN MADE PRIOR TO ACCEPTING SITE FOR THE FINAL C OF O.