Permit: T09BU01848

Parcel: 130072050

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
12/08/2011 STORMWATER INSTALL OF CONTROLS Approved
08/30/2011 STORMWATER INSTALL OF CONTROLS Continued Controls have been removed however no erosion concerns at this time, parking area is paved only planter areas are bare.
07/27/2011 STORMWATER INSTALL OF CONTROLS Continued No storm concerns at this time.
04/27/2011 STORMWATER INSTALL OF CONTROLS Continued No storm problems at this time.
02/01/2011 STORMWATER INSTALL OF CONTROLS Continued No storm control problems.
12/16/2010 STORMWATER INSTALL OF CONTROLS Continued Project on hold, no storm concerns at this time.
10/13/2010 STORMWATER INSTALL OF CONTROLS Continued No activity on site no strom concerns
03/17/2010 STORMWATER INSTALL OF CONTROLS Continued Contractor did not pave parking lot so asked that he install SWPPP controls, contractor did not have NOI on site.
03/11/2010 STORMWATER INSTALL OF CONTROLS Continued Will install controls if paving is not completed next week.