Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Continued
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T09BU01552
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/09/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | CHECKED WITH ELIZABETH ON STATUS OF AS-BUILTS NECESSARY TO CLOSE OUT PERMIT. | |
01/27/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | SPOKE WITH ELIZABETH REGARDING NEED FOR AS-BUILTS ON THIS PROJECT. SHE CONFIRMED THAT APPROVED REVISED DRAWINGS WERE NECESSARY. CONVEYED THIS INFORMATION TO RYAN. 1/25/10 Malena - Following up regarding the drainage improvements for the stormdrain pipe and inlet structures at Granada near one of the Gem show sites; Someone called this morning to confirm, that indeed they will need to submit the as-builts (which I believe is for for T09OT02215). I told them to submit as-built grading plans under the T# at the permit counter so that it can be briefly reviewed and then, if acceptable, it is given to our PDSD Engineering Inspector for the final inspections. They need to submit 2 copies of the as-builts and a letter of substantial conformance. This will capture the change for the smaller grated inlets that we did over the counter. I told them to call me with any questions. Elizabeth |
|
11/30/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | >>> Elizabeth Leibold 11/30/2009 2:06 PM >>> Small change accepted at the counter - no review submitted for this revision. Grated inlet type changed at junction between new and existing pipe. Will be shown on as-built submittal; I placed a copy of proposed change in the Inspector's Box for your use until as-builts are submitted. |
|
11/13/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | MET ON SITE WITH ENGINEER, BRIAN SILLS (517-420-4413) AND CONTRACTOR TO DISCUSS PROJECT. REALLIGNMENT OF DRAINAGE CHANNEL. PROJECT WILL ALSO CLEAR A VIOLATION PENDING FROM DNR REGARDING VEGETATION IN DRAINAGE CHANNEL. |